ISSN: 1003-6326
CN: 43-1239/TG
CODEN: TNMCEW

Vol. 27    No. 12    December 2017

[PDF]    [Flash]
Open pit waste removal optimization through equipment fleet scheduling
Xiao-wei GU1, Qing WANG1, Xiao-chuan XU1, Jian-ping LIU1,2, Tai-wei SUN1, Kun DU1
(1. College of Resource and Civil Engineering, Northeastern University, Shenyang 110819, China; 2. Dongmei Foundation Company of Shenyang, Shenyang 110016, China)
Abstract: A neighborhood search algorithm was proposed to simultaneously schedule the waste removal quantity and the equipment fleet profile over the mine life for open pit mines. An initial search domain was first defined and a good schedule was obtained as the current best schedule by searching in this domain. Then, progressively narrower neighborhood search domains were constructed around the current best schedule to search for better schedules. The objective is to minimize the present value of waste removal costs over the mine life. The resulting schedule from this algorithm provides a complete fleet profile for each year over the mine life: the selected equipment models, the number of equipment units of each model, the age of each unit, as well as the quantity of waste removed. A numerical example of application was provided to demonstrate the feasibility and merits of the algorithm.
Key words: open pit; waste removal; equipment fleet; scheduling; neighborhood search
Superintended by The China Association for Science and Technology (CAST)
Sponsored by The Nonferrous Metals Society of China (NFSOC)
Managed by Central South University (CSU) 湘ICP备09001153号-9